Social Icons

twitterfacebooklinkedin

Friday 13 January 2017

You’ll be able to board Metro to airport from 2020

With Lucknow Metro Rail Corporation aiming to begin Metro airport station construction by June this year, people of Lucknow should hopefully be able to board the Metro to Chaudhary Charan Singh (Amausi) airport from January 2020.
LMRC has floated tender for design and construction of airport station which requires the contractor to build station in 30 months. So, if the work begins in June 2017, it should be completed by December 2019, allowing the public access by 2020, a year after the start of the entire North-South corridor from Munshipulia to Amausi station. The airport station would be the last halt on this corridor.

The airport station will be built underground. It will have two entrance corridors leading to both terminals -- international (T1) and domestic (T2). At both entrances, passengers would have to go downstairs to reach the concourse level of the underground station. This would have amenities like the waiting area, lounge, cafeteria, shops, bookstore and eateries for passengers waiting for their flight.
To Read the News in Full 04/01/17 The Times Of India
 mobile app1.jpg

No comments:

Post a Comment